One of the most common questions Vaughan homeowners ask before starting a cabinet project is: “How long will this actually take?” It’s the right question — a kitchen renovation affects daily life in a way that a paint job or flooring refresh doesn’t. The honest answer: a full custom kitchen cabinet project from first consultation to final installation typically takes 8–14 weeks. Here’s exactly what drives that timeline, what happens at each stage, and how DKC Wooden Cabinetry manages the process to minimize disruption for Vaughan families.
The 5 Stages of a Custom Cabinet Project Timeline
Stage 1: Initial Consultation (Week 1–2)
After your first call to DKC, we schedule a free in-home consultation at your Vaughan home. During this visit, our designer:
- Measures every wall, ceiling height, and floor irregularity in the relevant rooms
- Documents existing plumbing, electrical, and appliance locations
- Reviews your style preferences and functional needs
- Photographs the space for reference during design
Timeline note: Consultations can typically be scheduled within 1–2 weeks of first contact during normal periods. During peak season (spring and fall), it may be 2–3 weeks.
Stage 2: Design and Quote (1–2 Weeks After Consultation)
After the site visit, DKC’s design team produces:
- A detailed floor plan drawing to your room’s exact dimensions
- 3D renderings showing your cabinet layout with your chosen finishes
- A fixed-price quote itemizing all materials, finishes, hardware, and installation costs
Once you receive the design package, most Vaughan clients take 1–2 weeks to review, refine, and approve. Changes at this stage are inexpensive — changes after production begins are not. We encourage clients to take their time here.
Stage 3: Production / Fabrication (6–10 Weeks)
This is the longest stage — and the most invisible to you. Once you approve the design and pay the production deposit, your cabinet system enters DKC’s production queue at our Concord workshop. Here’s what’s happening during those weeks:
- Material ordering: 3/4″ Baltic birch plywood is ordered and received. Finish materials and hardware are sourced.
- CNC cutting: All panels are cut to precise dimensions for your specific layout — not standard sizes.
- Assembly: Cabinet boxes are assembled with dado joints, glued, and fastened for maximum structural integrity.
- Finishing: Priming, sanding, colour coats, and the catalyzed conversion varnish topcoat are applied in our finishing booth. White and light colours require additional coats and curing time.
- Door and drawer production: Doors are produced separately and go through their own sanding, finishing, and quality control process.
- Hardware installation: Hinges, drawer slides, and handles are attached and adjusted.
- Quality inspection: Every cabinet is inspected before delivery is scheduled.
What affects production time:
- Number of rooms (kitchen + closet + mudroom = longer than kitchen alone)
- Finish colour (whites and light colours require more coats and curing time)
- Custom features (glass inserts, fluted panels, custom sizing)
- Current production schedule (spring and fall are peak seasons)
Stage 4: Installation (2–5 Business Days)
DKC’s own installation crew handles delivery and installation — no subcontractors. Here’s the typical installation sequence for a kitchen:
- Day 1: Demo of existing cabinets (if applicable), delivery of new cabinets to site
- Day 1–2: Base cabinet installation — levelling, shimming, securing to walls
- Day 2–3: Upper cabinet installation, fridge and range surrounds
- Day 3–4: Island assembly, pantry installation
- Day 4–5: Drawer front installation, hardware attachment, door adjustment, moulding and trim
Countertop templating (if DKC is not supplying countertops) typically happens after base cabinet installation is complete — the counter fabricator comes to template, then returns 1–2 weeks later for installation.
Stage 5: Final Walkthrough (Installation Day or Day After)
DKC’s installation lead walks through the project with you before leaving. Every drawer is checked for smooth operation, every door is checked for proper alignment, every hinge is adjusted. This is also when any minor cosmetic touch-ups are completed. Final payment is due at this stage — not before.
Full Project Timeline Summary
| Stage | Typical Duration | Your Involvement |
|---|---|---|
| Initial consultation | 1–2 hours (site visit) | High — you’re there |
| Scheduling consultation | 1–2 weeks wait | Low — just book |
| Design and quote | 1–2 weeks (DKC produces it) | Medium — review and approve |
| Production / fabrication | 6–10 weeks | Very low — DKC works in the workshop |
| Installation | 2–5 business days | High — your home is active |
| Countertop template + install | 1–2 additional weeks | Low — subcontractor coordinates |
| Total (cabinets only) | 10–16 weeks typically |
How to Minimize Disruption During Installation
For kitchen projects, your kitchen will be functionally unavailable during the installation period (2–5 days). Here’s what DKC recommends:
- Plan a temporary kitchen. A folding table, microwave, and small fridge in another room handles meals during installation days.
- Clear the kitchen before installation day. DKC’s crew can demo faster and work more efficiently in a clear space. Remove everything from existing cabinets and countertops before the crew arrives.
- Keep countertop fabrication and appliance delivery sequenced correctly. Appliances should arrive AFTER cabinet and countertop installation is complete to avoid having appliances sitting in the way.
- Plan for countertop lag time. There’s typically a 1–2 week gap between cabinet installation completion and countertop installation. Plan to use the kitchen with no countertops for this period if needed — it’s workable with a plywood temporary surface.
What Causes Delays — And How DKC Prevents Them
The most common causes of cabinet project delays in Vaughan:
- Design changes after production starts. Every design change after the production deposit is paid delays the project. DKC’s thorough design consultation and 3D rendering process is specifically designed to get all changes done before production begins.
- Site conditions not matching measurements. If walls are significantly out of level or out of square, installation takes longer. DKC’s pre-installation site check flags these issues before installation day.
- Appliance delivery delays. If a range hood or refrigerator is backordered, it can hold up installation sequencing. DKC advises on appliance delivery timing during the project planning stage.
- Other trades not finished. Flooring, electrical, or plumbing rough-in work must be complete before cabinet installation begins. DKC coordinates with your general contractor if applicable.
Frequently Asked Questions
Can DKC do rush cabinet projects in Vaughan?
For smaller projects (a single vanity, a closet system, or a mudroom), DKC can sometimes accommodate shorter production timelines. Full custom kitchens rarely have significant rush capacity — quality fabrication takes the time it takes. If you have a hard deadline (a move-in date or a family event), tell us upfront and we’ll work backward from that date to plan the project.
What happens if my house isn’t ready when the cabinets are done?
DKC can store completed cabinets at our Concord workshop for a short period (typically 2–4 weeks) if your renovation site isn’t ready for installation. Extended storage may incur a fee — discuss this with your project coordinator.
How long does a bathroom vanity cabinet project take vs a full kitchen?
A single custom bathroom vanity typically has a shorter production timeline (4–6 weeks fabrication) and installs in 4–8 hours on installation day. The consultation-to-installation timeline is usually 6–10 weeks for a standalone vanity — shorter than a kitchen but using the same custom process.
Can I use my kitchen while the cabinets are being built?
Yes — the 6–10 week fabrication stage happens entirely at DKC’s Concord workshop. Your kitchen is fully functional during this period. Disruption only begins when the installation crew arrives on installation day.
Ready to start your Vaughan cabinet project? The best time to call is 8–12 weeks before your desired completion date. Contact DKC Wooden Cabinetry at 905-830-3060 or visit dkcwoodencabinetry.com to book your free in-home consultation.
nnReady to Transform Your Home?
n780+ GTA North homeowners trust DKC Wooden Cabinetry. Free in-home consultation. 3D design presentation. 10-year workmanship warranty. In-house manufacturing and installation.
nExplore DKC Custom Cabinetry Services in Vaughan & GTA North: